Cikande Factory Data:
1. land: 180x166m = 29,880 m².
2. Building:
a. Main Factory Building: 96x42m = 4,032m²:
Production Space: 84x42m = 3,528m².
1st floor office, warehouse and loading dock: 12x42m 504m².
2nd floor office, toilet and pantry (in Main Factory Building): 12x42m 504m².
b. Balcony : 7x3m = 21m².
c. floor for Mess, Toilet, Prayer Room and Canteen: 9x54m = 486m².
d. Concrete floor in front of the Main Factory Building: 12x40m = 480m².
e. Concrete cast floor next to Main Factory Building: 6x108m = 648m².
f. container 40ft.
g. Main Panel, Generator and PLN Substation: 19x13m = 247m².
h. Pos Security: 4x2,7m 10,8m².
Hrga.70 miliar
3. Electricity: 240KVA
mnimar
*Perhitungan kalkulator simulasi di bawah adalah ilustrasi. untuk Harga KPR/KPA akan ditentukan oleh Pihak Developer
Harga Properti
Pokok Pinjaman
Harga Properti - Uang Muka (DP)
Biaya Administrasi
**Terdiri dari DP dan Biaya Kredit
(bergantung pada obyek agunan dan profil nasabah)
Pokok Pinjaman
0
Bunga 0% 0 Tahun
Suku Bunga
0%
Tenor Dipilih
0 Tahun
Minimal Tenor
0 Tahun
Jangka Waktu
Maks 0 Tahun
Tahun ke-1
Bunga %
Tahun ke-3
Bunga %
Tahun ke-5
Bunga %
Tahun ke-2
Bunga %
Tahun ke-4
Bunga %
Tahun ke-6
Mengikuti suku bunga BI, asumsi bunga floating %
Perbulan ( bulan pertama)
Bunga Fixed %
1. Nilai angsuran, suku bunga, tenor, uang muka dapat berbeda dengan persetujuan kredit, tergantung dari hasil analisa dan ketentuan yang sedang berlaku saat itu.
2. Terdapat biaya administrasi, appraisal, asuransi jiwa, asuransi kebakaran, notaris dan biaya lain dalam pengajuan KPR. Rincian biaya akan didapatkan setelah keputusan kredit diterima oleh calon debitur.
Estimasi Angsuran Setelah Floating
Asumsi Bunga Floating %
Anda bisa mendapatkan bunga 2,47% di tahun pertama (khusus untuk developer tertentu)